CHEMICAL PLANT CONCENTRATOR PLANT CODELCO SALVADOR DIVISION
A georeferenced 3D scan of the Chemical Plant facilities was made to create a point cloud, a cloud on which the 3D model was subsequently made.
Principal: JRI
REVIEW 3D MODELS
REGIONAL STADIUM TIERRA DE CAMPEONES IQUIQUE – Tarapacá Region.
Review of the 3D model developed by the construction company in order to control the progress of the work and detect interferences between specialties.
Principal: Ministry of Public Works
3D SCANNER LIFTING
ELECTRICAL ROOMS CONCENTRATOR PLANT CODELCO SALVADOR DIVISION
A 3D scan was made of all the electrical rooms of the Concentrator Plant and Hydrometallurgical Plant for the creation of a point cloud, a cloud on which the 3D model was subsequently made.
Principal: JRI
REVIEW 3D MODELS
COASTAL EDGE IMPROVEMENT LOS VERDES IQUIQUE – Tarapacá Region.
Carrying out 3D LOD 300 modeling to control work progress.
Principal: Ministry of Public Works
3D MODELING FROM POINT CLOUD
POND COURTYARD – CHEMICAL AND HYDROMETALLURGICAL PLANT CODELCO DIVISION SALVADOR
Georeferenced 3D modeling LOD 400 of the existing facilities of the pond yard executed in order to project new facilities and minimize interferences.
Principal: JRI
3D MODELING TALCA TEMPERED POOL
TALCA – Maule Region.
3D LOD 300 modeling for site control and interference stop.
Principal: Ministry of Public Works
3D MODELING FROM POINT CLOUD
BOILER ROOM – CHEMICAL AND HYDROMETALURCAL PLANT CODELCO DIVISIÓN SALVADOR
LOD 400 georeferenced 3D modeling of the existing installations of the Boiler Room executed in order to design new installations and minimize interferences.
3D MODELING
ING. DETAILS THICKENERS OF TAILING CONCENTRATOR PLANT CODELCO DIVISIÓN SALVADOR.
Preparation of the 3D model of the Tailings Thickeners project.