Technical Inspection of Works

Technical Inspection of Works

The term building is used to define and describe all those constructions made artificially by humans for various but specific purposes.

The buildings are works that the human being designs, plans and executes in different spaces, sizes and shapes, in most cases to inhabit them or use them as sheltered spaces. The most common and widespread buildings are residential buildings, engineering constructions, shops, temples, monuments, industrial areas, among others.

CHILD JESÚS PARISH TEMPLE RESTORATION, VILLA ALEGRE

See Project

REPLACEMENT AND RESTORATION SAN JOSÉ DEL CARMEN MUSEUM AND CHURCH, EL HUIQUE

See Project

INFRASTRUCTURE STANDARDIZATION LICEO OCTAVIO PALMA PÉREZ, ARICA

See Project

REPLACEMENT OF THE INVESTIGATION HALL, VALDIVIA

See Project

PICHILEMU COASTAL EDGE STAGE II

See Project

COASTAL EDGE IMPROVEMENT STAGE 1, LAS MACHAS BEACH

See Project

ADVICE TO THE FISCAL INSPECTION OF THE CONSTRUCTION WORK CENTER OF FAMILY HEALTH SECTOR SUR, COMUNA ARICA

See Project

ADVICE TO THE TAX INSPECTION FOR THE REPLACEMENT WORK OF THE 1ST POLICE STATION OF SAN CLEMENTE PCSP 2011

See Project

RESTORATION AND PLACEMENT IN VALUE CASA VIOLETA PARRA, SAN CARLOS

See Project

LAND OF CHAMPIONS STADIUM REPLACEMENT, IQUIQUE

See Project

RESET ESC. F-94 M. ZULETA ASTUDILLO, HUASCO

See Project

ADVICE TO THE FISCAL INSPECTION OF THE WORK REPOSITIONING ESCUELA DE SUBOFICIALES S.O.M FABRICIANO GONZÁLEZ URZÚA

See Project

CALETA LOS VERDES COASTAL EDGE CONSTRUCTION

See Project

ADVICE TO THE FISCAL INSPECTION OF THE WORK «CONSTRUCTION OF THE FEMALE PENITENTIARY COMPLEX ARICA»

See Project

ADVICE TO THE TAX INSPECTION FOR THE WORK "CONSTRUCTION PASEO COSTERO SECTOR TONGOY"

See Project

ADVICE TO THE TAX INSPECTION FOR THE EXECUTION OF THE WORK REPLACEMENT 4TH POLICE STATION LOMAS VERDES CONCEPCION

See Project

CATEDRAL NATIONAL MONUMENT RESTORATION, SAN MARCOS, ARICA

See Project

CONSTRUCTION OF TEMPERED POOL, TALCA

See Project

ADVICE TO THE TAX INSPECTION FOR THE INTERDISCIPLINARY WORK OF NEUROSCIENCE, VALPARAISO

See Project

CONSTRUCTION CONSTRUCTION SUBCOMMISARY EL BELLOTO, COMMUNA DE QUILPUÉ

See Project

COASTAL WALK CONSTRUCTION, TONGOY SECTOR

See Project

ADVICE TO THE FISCAL WORK INSPECTION FOR THE TIERRA DE CAMPEONES STADIUM REPLACEMENT PROJECT, IQUIQUE

See Project

ADVICE TO THE FISCAL INSPECTION OF THE DESIGN CONSTRUCTION OF THE EL ARENAL EDUCATION AND WORK MODEL PREMISES

See Project

ADVICE TO THE TAX INSPECTION FOR THE WORK REPLACEMENT AND EQUIPMENT LEGAL MEDICAL SERVICE TALCA

See Project

OF THE DESIGN RESTORATION CASA MALDINI, COPIAPÓ

See Project

KIDS GARDEN CONSTRUCTION WITH COT ROOM, EL ALTO SECTOR

See Project

INFRASTRUCTURE CONSERVATION INSTITUTO TELETÓN, IQUIQUE

See Project

REPLACEMENT 6 ° POLICE STATION, CHILLÁN VIEJO UNDER PCSP

See Project

COASTAL EDGE EL SALITRE TOCOPILLA BEACH

See Project

ADVICE TO THE TAX INSPECTION OF THE INFRASTRUCTURE STANDARDIZATION WORK LICEO OCTAVIO PALMA PÉREZ, ARICA

See Project

ADVICE TO THE FISCAL INSPECTION OF THE WORK REPLACEMENT LOCAL ATTORNEY'S OFFICE OF POZO ALMONTE

See Project

ADVICE TO THE TAX INSPECTION OF THE WORK "RESTORATION CHURCH SANTA ROSA DE LIMA, FREIRINA"

See Project

CHILD JESÚS PARISH TEMPLE RESTORATION, VILLA ALEGRE

Restoration of the Parish Temple of the Child Jesus of Villa Alegre. Work located in the commune of Villa Alegre, Maule Region. It corresponds to an elongated nave of 30 by 90 m. designed under the architectural guidelines of the neoclassical tradition. During the 2010 earthquake, the Church suffered considerable structural damage, as a result of the earthquake, the longitudinal wall collapsed causing the roof, with its beams and false ceiling, to fall in the middle of the central nave of the temple. The restoration of this monument considers the rescue of the sky, the structural reinforcement through the insertion of buttresses of the north and south walls of the roof and ceiling of the central nave, the restitution of the lateral corridors and the integral repair of the bell tower.

Initial amount of the contract:

$1.380.429.386

Builder:

Proas Ltda

Term:

420 days

Counseling termination date:

December, 2018.

Templo_parroquial_Niño_Jesús_de_Villa_Alegre_II-1024x685

REPLACEMENT AND RESTORATION SAN JOSÉ DEL CARMEN MUSEUM AND CHURCH, EL HUIQUE

Located in the commune of Palmilla, it is the largest asset recovery project in the O’Higgins Region after the 2010 earthquake that hit the property hard, leaving it with serious structural damage, the tasks are concentrated on the recovery of the south wing of the declared property. National Historic Monument in 1971, structural consolidation in the portico, church tower, restoration of adobe walls, doors and windows, polychrome work on baseboards, restoration of the front portal, bell tower, among others.

Initial amount of the contract:

$1.817.027.000

Builder:

Constructora Desco S.A

Term:

540 days

Counseling termination date:

February, 2014.

propuesta-web-huique-1_13-1

CONSERVATION INFRASTRUCTURE INSTITUTO TELETÓN, IQUIQUE

The project consists of the improvement of different enclosures and areas of the existing building, which is located at José Joaquín Pérez # 999 street, Iquique, Tarapacá Region. Among the works to be inspected are; improvement of energy efficiency, for which a change in the cladding of the envelope is considered, incorporation of an air conditioning system, replacement of windows, doors, lighting equipment, sanitary fixtures, paintings, improvements in pavements in the central patio, roof improvement, construction of evacuation ramps from the second level and minor extensions, among others.

Initial amount of the contract:

$ 12.215.801.649

Builder:

COSAL S.A. Chile.

Term:

510 days

Counseling termination date:

December, 2019.

REPLACEMENT OF THE INVESTIGATIONS HEADQUARTERS, VALDIVIA

The project consists of the construction of a 4,800 m2 building on a plot of approximately 10,000 m2, loaned by the SERVIU of the Los Ríos Region, located on Avenida Francia with Calle San Luis, in the city of Valdivia, Police Region of The rivers. The contract considers the execution of a virtual polygon, an institutional clinic, auditorium room with a capacity for 180 people, room for interviews, multi-court, private institutional plaza. This barracks also considers an access control system and biometric locks in restricted areas, a closed circuit TV system and LED lighting and biomass central heating, among others. These systems link electronic and software technology, with the possibility of controlling them through IP address.

Initial amount of the contract:

$ 8.564.951.718

Builder:

COPCISA S.A. Agencia en Chile.

Term:

750 days

Counseling termination date:

February, 2020.

COASTAL AIFBORDE PICHILEMU STAGE II

The project corresponds to the Advisory to the Fiscal Inspection of the Pichilemu Coastal Edge Improvement Work, Stage II. It is located in the town of Pichilemu and extends from Caleta de Pescadores to La Puntilla and from La Puntilla to Agustín Ross Edwards Street.

For the improvement of the coastal border, the execution of containment of the coastal border is contemplated through walls of variable height depending on the geography and infrastructure of the place, stairs and access ramps to the beach along the promenade, planters and green areas, pubic baths for women and men with access for people with reduced mobility and viewpoints to contemplate the natural landscape.

Initial amount of the contract:

$ 1.731.262.499

Builder:

SEGURIEQUIP LTDA.

Term:

540 days

Counseling termination date:

COASTAL EDGE IMPROVEMENT STAGE 1, LAS MACHAS BEACH

The coastal border improvement project Las Machas Beach Sector Stage 1 located in the Atacama Region seeks to provide the Bahía Inglesa sector with infrastructure and strengthen its tourism development, considers the construction of pedestrian walkways, green areas, bicycle lanes and lighting, among others and proposes not only a beautification of the coastal edge of Las Machas but also a meeting of citizens with the sea, thanks to high-standard works that contribute to a better quality of life for those who live in the sector, being their main beneficiaries.

Initial amount of the contract:

$ 2.938.883.265

Builder:

Constructora Salfa S.A.

Term:

360 days

Counseling termination date:

February, 2017.

ADVICE TO THE FISCAL INSPECTION OF THE CONSTRUCTION WORK CENTER OF FAMILY HEALTH SECTOR SUR, COMUNA ARICA

A building developed based on a steel bearing structure, considering rigid frames and a general structure of reinforced concrete.

A 2-level building that is structured on the basis of traditional building elements and is located on a plot of approximately 400 m2.

Initial amount of the contract:

Builder:

Soc. PSI Ltda.

Term:

570 days

Counseling termination date:

ADVICE TO THE TAX INSPECTION FOR THE REPLACEMENT WORK OF THE 1ST POLICE STATION OF SAN CLEMENTE PCSP 2011

A building made up of metallic thermal panels, which are made up of 0.5mm oven pre-painted steel roofs and a polystyrene core.

The scheme of the project is divided into 2 volumes configuring an “L”. This volume houses a maneuvering yard, which contains the parking lots and service areas.

The volumes are of 2 levels, where the access façade is identified with the volume that contains the public and security program and the second volume, is identified with the habitability program of the Barracks.

Initial amount of the contract:

Builder:

Constructora ABC

Term:

240 days

Counseling termination date:

RESTORATION AND PLACEMENT IN VALUE CASA VIOLETA PARRA, SAN CARLOS

Property located in the commune of San Carlos, in the province of Ñuble. The restoration includes 141 m2 of the original house; volume of a level with a continuous façade, which is made up of entrance hall areas, a central corridor that connects and articulates all the interior areas, two rooms, one on each side of the latter and a rear corridor that faces the patio. of the construction of 344 m2 of new construction; volume of two levels with continuity of boundaries, which is constituted in its level-1 (semi-buried) by two multipurpose workshops with their corresponding warehouses and in its level 1 by cafeteria-store, kitchen with handler’s bathroom, public toilets and workshop multipurpose with cellar. Finally, the restoration of the 306-square-meter interior patio, all maintaining its original character.

Initial amount of the contract:

$ 884.206.125

Builder:

Proas Ltda

Term:

360 days

Counseling termination date:

March, 2016.

2

REPLACEMENT TIERRA DE CAMPEONES STADIUM, IQUIQUE

The project consists of the restitution of the Tierra de Campeones stadium, located at Avenida Salvador Allende 2950, ​​in the commune of Iquique, Tarapacá Region. The work considers the total construction of the structure of the building, for this it contemplates the restitution of the structure of gallery walls, a field with natural grass, an athletic track, a roof structure (tensomembrane) and a 5-level building. The building is distributed as follows; Level 1: sanitary facilities room and electrical facilities room, gym, dressing rooms, cafeterias, administrative offices; Level 2: dressing rooms, anti-doping rooms, infirmary rooms, warm-up areas, access to the VIP lounge, access to the pitch and bleachers; Level 3: male female toilet services; sales positions, cells and infirmary; Level 4: VIP lounge, VIP seats, Terrace; sanitary facilities; Level 5: security control offices; radio and television transmission rooms. The total area to be rebuilt is 15,523 m2, on an area of ​​approximately 32,500 m2. The stadium will have 13,139 seats, distributed as follows: 4,346 north stands, 4,345 south stands, 3,167 andes stands, 929 pacific grandstand, 316 VIP seats and 36 disabled sector.

Initial amount of the contract:

$ 23.252.365.507

Builder:

Constructora ICAFAL Ingeniería y Construcción S.A.

Term:

550 days

Counseling termination date:

October, 2019.

Tierra de campeones

REPOSITION ESC. F-94 M. ZULETA ASTUDILLO, HUASCO

The project consists of the replacement of the emblematic school of the city of Huasco, called Escuela F-94 Mireya Zuleta A, located in the center of the same city in calle Maestranza n ° 115, next to the main square of the commune de Huasco, Atacama Region. It contemplates the construction of several modules, which have a destination for classrooms and various services; corresponding to the administration areas, multiple classrooms, library, multipurpose rooms, dining room, bathrooms, showers, dressing rooms, kitchen and courts.

Initial amount of the contract:

$ 5.899.582.273

Builder:

Constructora Cosal S.A.

Term:

540 days

Counseling termination date:

October, 2019.

IMG_1195-1-1024x768

ADVICE TO THE TAX INSPECTION OF THE WORK REPLACEMENT SCHOOL OF SUBOFICIALES SOM FABRICIANO GONZÁLEZ URZÚA

The Esucar Police School project has a main building with 4 levels and 2 underground floors. For this project, reinforced concrete structures for columns, beams and slabs are contemplated, as well as the development of the specialties of Sanitary Installations, Gas, Air Conditioning and Ventilation, Fire Safety, Security and Surveillance, Electrical and Lighting Installations, Energy Efficiency. The 16,718 square meter construction will run until 2021 and will house education, administration, auditorium and food activities, structures that will be built based on two requested patios.

Initial amount of the contract:

$ 19.333.764.577

Builder:

Constructora Claro Vicuña Valenzuela S.A.

Term:

545 days

Counseling termination date:

November, 2021.

COASTAL EDGE CONSTRUCTION CALETA LOS VERDES

The project corresponds to the Advisory to the Fiscal Inspection of the Construction Work on the Coastal Caleta Los Verdes. It is located in the town of Caleta Los Verdes, Iquique. The work corresponds to the execution of a coastal walk in the town of Caleta Los Verdes, Iquique. This work will be developed from the access to the existing beach, from the old route A-1.

Although these are not intervened, they must be coupled to this access, in such a way as to provide accessibility and continuity from the Route. It contemplates the execution of a pedestrian walk and cycle path 800 meters long. On the one hand, the pedestrian promenade is 2.8 meters wide in its normal sections and 4.8 meters wide in the sectors with shaded areas and the central sector of promises.

Initial amount of the contract:

$ 103.345.000

Builder:

Constructora de Pavimentos Asfalticos Bitumix S.A.

Term:

285 days

Counseling termination date:

ADVICE TO THE FISCAL INSPECTION OF THE WORK «CONSTRUCTION OF THE FEMALE PENITENTIARY COMPLEX ARICA»

With an investment of 27,110 million pesos, the project is located next to the current Arica Penitentiary Center, located in Quebrada de Acha. Its surface area is 10,084 square meters and can accommodate 384 inmates.

It is divided into three zones: External zone: administrative buildings, personnel, guard, access control, services and annexes. Security Strip Zone: vehicle access control, surveillance booths and security rings are located. Internal area: administrative buildings, personnel, health area, centralized and intimate visits, workshops, food and laundry center, religious services and sports area, nursery and centralized school, orchard area, standard confinement modules and special confinement modules (infants, pregnant women, the elderly and youth).

Initial amount of the contract:

Builder:

COSAL S.A

Term:

730 days

Counseling termination date:

ADVICE TO THE TAX INSPECTION FOR THE WORK "CONSTRUCTION PASEO COSTERO SECTOR TONGOY"

The project is divided into sectors according to the different activities.

It incorporates paving for vehicles, parking lots, pedestrian promenade, bike lanes, rest and contemplation areas including equipment, street furniture and lighting.

The town of Tongoy is located in the commune of Coquimbo, Elqui Province, Coquimbo Region.

Initial amount of the contract:

Builder:

Construcciones y Pavimentos Ltda.

Term:

252 days

Counseling termination date:

ADVICE TO THE TAX INSPECTION FOR THE EXECUTION OF THE WORK REPLACEMENT 4TH POLICE STATION LOMAS VERDES CONCEPCION

The building is conceived on the basis of a steel bearing structure, considering rigid frames and collaborative slab. In turn, for the security area, a structure based on reinforced cellular concrete masonry is proposed, which acts independently of the main metal structure.

The building is made up of metallic thermal panels, which are made up of 0.5mm oven pre-painted steel roofs and a polystyrene core. The paneling is arranged both in façade walls, interior partitions and roof, generating a continuous thermal envelope. It should be noted that for this particular case only frieze panels are used

Initial amount of the contract:

Builder:

Claro Vicuña Valenzuela S.A

Term:

210 days

Counseling termination date:

CATEDRAL NATIONAL MONUMENT RESTORATION, SAN MARCOS, ARICA

Project of metallic structure and with wooden doors, the cathedral was declared a National Monument of Chile in 1984. Inside is the Historic Monument of the Bell of Arica, which weighs 900 kilos and which reaches the city in the first half of the century XVIII. Among the works to be carried out, it is considered to repair tile pavements and decking, as well as vertical plates and cracks in the glass; painting stone walls, the steps and the pavement of the esplanade; restore the gargoyles and rain gutters and equip the building with an exterior and interior lighting system.

Initial amount of the contract:

$738.481.213

Builder:

José Guerra & Cia Ltda.

Term:

365 days

Counseling termination date:

August, 2016.

aosmdoiasdm-1

CONSTRUCTION SWIMMING POOL, TALCA

Contract that is developed through a design that seeks, as an objective, to achieve a building with a very clear and recognizable functional project; through the incorporation of circulations, entrances, dressing rooms, etc., in addition to considering an efficient use of natural light with a bioclimatic design that captures eastern light and sifts the west, through an adequate use of materials and economy of works. All this, developed in a building with a clean, direct architecture, with a clear and resounding image, giving an identity of its own to the project for the Talca Heated Pool within the Talca macro – sports grounds. It is located at Avenida Bernardo O’Higgins No. 251, city of Talca, Maule Region.

Initial amount of the contract:

$ 2.568.648.285

Builder:

Constructora ABC Limitada.

Term:

420 days

Counseling termination date:

November, 2019.

ADVICE TO THE TAX INSPECTION FOR THE INTERDISCIPLINARY WORK OF NEUROSCIENCE, VALPARAISO

The work is located on the site where the Santiago Severin building was located, which was built at the beginning of the 20th century and was destroyed by a fire in 2004. On the land there are masonry walls of important dimensions and openings that form windows with arch-shaped upper lintel. According to studies carried out by specialists, the structure shows (reversible) damage caused by inclement weather and the long exposure of the masonry to humidity and erosion from wind and rain. It lacks concrete reinforcements which is typical of early 20th century structures, however, no structural damage is observed that endangers the stability of the upper fairway. With regard to construction works, it is located in a typical area.

Initial amount of the contract:

$ 7.425.891.100

Builder:

BROTEC CONSTRUCCIÓN SPA

Term:

595 days

Counseling termination date:

March, 2021.

CONSTRUCTION CONSTRUCTION SUBCOMMISARY EL BELLOTO, COMMUNA DE QUILPUÉ

EL BELLOTO SUBCOMMISSION CONSTRUCTION, QUILPUE, approximately 1,080 m2. It also includes the construction of an Annex House and exterior works such as a multi-court, in the Quilpué commune, Valparaíso Region.

Advancing according to the deadlines and with the necessary precautions to face the health crisis that the country is experiencing, are the construction works of the new El Belloto Sub-Police Station in the Quilpué commune.

The works are executed by the Ministry of Public Works, through the Directorate of Architecture, with resources provided by the Government for the construction of new barracks for Carabineros de Chile

It is a work long awaited by the local community, which required the direct presence of the Carabineros to reinforce its security, according to what was explained by the OO.PP.seremi, Raúl Fuhrer Sánchez.

Initial amount of the contract:

Builder:

Term:

Counseling termination date:

CONSTRUCCIÓN PASEO COSTERO, TONGOY SECTOR

The construction project of the Coastal walk located in the town of Tongoy in the Coquimbo region with an extension of 600 linear meters, includes the construction of pedestrian paths, shading, street furniture, bike lanes, parking lots, lighting, access to the beach, among others. For the generation of public spaces for recreation and leisure, increasing the well-being of the community, enhancing the attractiveness of the place and promoting local tourism.

Initial amount of the contract:

$ 2.687.767.912

Builder:

Construcciones y Pavimentos LTDA.

Term:

450 days

Counseling termination date:

December, 2016.

ADVICE TO THE FISCAL WORK INSPECTION FOR THE TIERRA DE CAMPEONES STADIUM REPLACEMENT PROJECT, IQUIQUE

The project is developed on a 70,146.55 m2 site, contemplates the complete demolition of the existing infrastructure, due to its conditions of use and damage caused by the last earthquakes that occurred in the city (2005 and 2014). The demolition includes grandstands in general, a canopy structure, the current stadium building and the removal of the 8 light towers.

The construction project includes a capacity of 13,600 seated spectators

Initial amount of the contract:

Builder:

ICAFAL Ingeniería y Construcción S.A.

Term:

630 days

Counseling termination date:

ADVICE TO THE FISCAL INSPECTION OF THE DESIGN CONSTRUCTION OF THE EL ARENAL EDUCATION AND WORK MODEL PREMISES

The contract consists of the review of the design delivered by the consulting company.

The stages delivered are reviewed and it is verified that the project is developed based on current regulations. The project will be located on an area of ​​89 hectares, will have a population of more than 3,000 inmates (inmates and defendants) and a workforce of more than 500 people.

A project based on a North American model, aims to control the overcrowding of inmates in the enclosures, locate the construction far from the city (to make better use of the land), respect for the minimum conditions of habitability of the inmates and that they are focused on the social reintegration, especially of those inmates of low and medium danger.

.

Initial amount of the contract:

Builder:

Term:

270 days

Counseling termination date:

ADVICE TO THE TAX INSPECTION FOR THE WORK REPLACEMENT AND EQUIPMENT LEGAL MEDICAL SERVICE TALCA

The Talca Medical Legal Service building corresponds to a building of approximately 1800 m2.

It consists of two floors plus an underground, reinforced concrete as a structural base and different types of partitions in interior spaces. It includes areas of thanatology, clinic that includes injuries and forensic sexology, adequate spaces for care, mental health, alcohol laboratory, biochemistry and DNA paternity.

Initial amount of the contract:

Builder:

Constructora ABC

Term:

270 days

Counseling termination date:

OF THE DESIGN RESTORATION CASA MALDINI, COPIAPÓ

Located in the Atacama Region and sent to be built in 1913 by the Italian immigrant Ambrogio Tornini, it was inhabited until the 1950s by his daughter and her husband, also the Italian immigrant Luigi Maldini, the process of carrying out the restoration includes Globally, all the existing construction, due to the fact that a major replacement of its wooden structure is required, especially structural partitions and roof structure, it is also intended to re-shape the back patio and the front garden with a proposal for landscaping and renovation of pavements that rescues the original meaning of it, turning it into a multipurpose outdoor space.

Initial amount of the contract:

$1.572.684.840

Builder:

Inmobiliaria e Inversiones Quilodran Ltda.

Term:

540 days

Counseling termination date:

In action.

Casa_Maldini_Copiapó_-_panoramio

KIDS GARDEN CONSTRUCTION WITH COT ROOM, EL ALTO SECTOR

The work corresponds to the Construction of Kindergarten with Nursery Room, El Alto Sector, Arica district, Arica and Parinacota Region. The project consists of a traditional construction site with reinforced concrete elements and metal structures. The project has a total land area of ​​2,530 m2, it is developed on one level and the total area to be built corresponds to 1,050.82 m2. The work is basically divided into items of, thick work; that involves so much earthmoving, concrete, partitions and roofs among others, terminations; that considers insulation, ceilings, pavements, overalls, hardware in general, equipment both in classrooms and in the kitchen, and finally an item of facilities in which specialties such as sewerage and drinking water, air conditioning.

Initial amount of the contract:

$ 2.199.160.095

Builder:

CIBEN E.I.R.L.

Term:

420 days

Counseling termination date:

November, 2018.

CONSERVATION INFRASTRUCTURE INSTITUTO TELETÓN, IQUIQUE

The project consists of the improvement of different enclosures and areas of the existing building, which is located at José Joaquín Pérez # 999 street, Iquique, Tarapacá Region. Among the works to be inspected are; improvement of energy efficiency, for which a change in the cladding of the envelope is considered, incorporation of an air conditioning system, replacement of windows, doors, lighting equipment, sanitary fixtures, paintings, improvements in pavements in the central patio, roof improvement, construction of evacuation ramps from the second level and minor extensions, among others.

Initial amount of the contract:

$ 997.707.106

Builder:

Sociedad de Proyectos y Servicios Ltda.

Term:

270 days

Counseling termination date:

August, 2019.

REPOSITION 6 ° POLICE STATION, CHILLÁN VIEJO BAJO PCSP

The project consists of the replacement of the 6th. Chillán Viejo Police Station under PCSP, located on Avenida Libertador Bernardo O’Higgins No. 2814, between Calle Serrano and Luis Araneda, in the commune of Chillán Viejo, Bío Bío Region. The structure consists of three levels, it does not consider underground, it contemplates an approximate area of ​​1,618.56m2. The enclosure is projected based on 15 cm thick reinforced concrete walls, which are lined on the outside with 40 cm thick expanded polystyrene sheets and 20 mm for features, which are adhered to the walls by means of adhesive . The vertical elements are executed in a metallic structure type Metalcon 90x38x12x0.85 mm. 80mm thick glass wool is considered as sound insulation.

Initial amount of the contract:

$ 2.462.880.540

Builder:

ALCORP S.A.

Term:

360 days

Counseling termination date:

January, 2018.

COASTAL EDGE PLAYA EL SALITRE TOCOPILLA

The project corresponds to the Advisory to the Fiscal Inspection of the Coastal Edge Improvement Work, El Salitre Beach Sector, Tocopilla, It is located in the Tocopilla commune in the II Region of Antofagasta.

For the improvement of the coastline, an increase in the number of ramps for pedestrian access and universal access is contemplated, increase the number of bleachers to develop the possibility of permanence and destination of spaces for various events, expansion of green areas to host meeting activities and contemplation, inclusion of playgrounds for children, shaders built in reinforced concrete and laminated wood for their durability over time, improve lighting on the coastline, build more parking lots, the creation of recreation and leisure spaces, living areas and contemplation, including bike lanes and also incorporating a deck on the edge of the sunny street in a material other than concrete for the purpose of pedestrian use and access to the beach.

Initial amount of the contract:

$ 2.726.076.344

Builder:

FLESAN S.A.

Term:

360 days

Counseling termination date

ADVICE TO THE TAX INSPECTION OF THE INFRASTRUCTURE STANDARDIZATION WORK LICEO OCTAVIO PALMA PÉREZ, ARICA

It corresponds to a building project with traditional construction processes, reinforced concrete and supporting metal structures are used which form the basis of this educational establishment, there are cement block masonry, structural partitions in galvanized steel, exterior and interior coatings, doors, windows and hardware details that are clearly visible in the project planimetry.

It is located on an area of ​​approximately 8,216.4 m2, as an existing situation there are 2-story buildings in areas of classrooms, a gym, bathrooms and casino areas

Initial amount of the contract:

Builder:

COSAL S.A.

Term:

570 days

Counseling termination date:

ADVICE TO THE FISCAL INSPECTION OF THE WORK REPLACEMENT LOCAL ATTORNEY'S OFFICE OF POZO ALMONTE

The work consists of the replacement of a reinforced concrete building, a metallic structure and supporting laminated wood.

Its architecture consists of a base level with two extensions, an approximate 300 m2 of interior surface and an approximate 800 m2 of exterior surface of land. On the first level it is possible to find offices, different types of control rooms, warehouses, dining room and sanitary services.

On the second level, administrators’ offices, prosecutor’s office, kitchenette, meeting room, among others.

Initial amount of the contract:

Builder:

Alvarado, Arancibia y CYA Ltda.

Term:

300 days

Counseling termination date: